InterviewHubPRO
Section Overview
Q45

Question 45 of 50

Part 5: Infrastructure as Code, SRE Observability & Production Troubleshooting (43 - 50)

90%
DevOps & Kubernetes (50 Qs)•Part 5: Infrastructure as Code, SRE Observability & Production Troubleshooting (43 - 50)

Site Reliability Engineering (SRE): SLI vs. SLO vs. SLA, Error Budgets, and Burn Rate alerting.

Reliability Engineering Foundations

Google's Site Reliability Engineering (SRE) framework replaces arbitrary uptime goals with mathematical error budgets.

sql
+-------------------------------------------------------------------------------+
|                      The SRE Service Level Hierarchy                          |
|                                                                               |
|   1. SLI (Indicator):    Actual measured real-time performance.               |
|                          Example: 99.94% of HTTP requests returned < 200ms.   |
|                                                                               |
|   2. SLO (Objective):    Internal target set by engineering & product.        |
|                          Example: 99.9% success rate over rolling 30 days.    |
|                                                                               |
|   3. SLA (Agreement):    External legal contract with customers.              |
|                          Example: 99.0% uptime; violation triggers credits.   |
|                                                                               |
|   4. Error Budget:       Acceptable unreliability (100% - SLO).               |
|                          99.9% SLO = 0.1% Error Budget (43.2 mins/month).     |
+-------------------------------------------------------------------------------+

Error Budget Burn Rate Alerting

Alerting on raw threshold spikes (e.g. "error rate > 1%") creates massive false positives during brief hiccups. SRE standardizes on Burn Rate Alerting:

  • Burn Rate 1: Consumes 100% of the 30-day budget in exactly 30 days.
  • Burn Rate 14.4: Consumes 100% of the 30-day budget in 2 days (2% of budget consumed in 1 hour).
  • Multi-Window Multi-Burn-Rate Alert: Pages an on-call engineer only if a high burn rate is confirmed across both a short window (e.g., 5m) and a long window (e.g., 1h), virtually eliminating phantom alerts.